Transforming Biopharma production with Siemens Xcelerator

Siemens
425 views March 3, 2026

What does it take to build a world-class biopharmaceutical facility — in just 25 months? ZETA, a global leader in engineering and automation, partnered with LOBA Biotech to develop a state-of-the-art production facility for Peginterferon Alpha 2a, powered by Siemens Xcelerator's digital ecosystem. By integrating ZETA's proprietary Smart Engineering Services (SES) platform — built on Siemens COMOS and hosted in the cloud — with Siemens Xcelerator's suite of digital tools, the project team unlocked a new level of collaboration, simulation, and operational precision. Digital Twin technology allowed engineers to simulate, train, and optimize operations before a single piece of equipment was installed, while real-time co-creation across global teams kept the project on track. The result is a facility that doesn't just meet today's standards — it sets a new benchmark for what's possible in biopharma manufacturing. Know more here https://sie.ag/3FE6A3…

Keyboard shortcuts

On. Switch them off if they collide with your assistive tools; ? still opens this sheet.

Go to

Press g then the letter.

  • gh Latest
  • gs Sources
  • gm Media
  • gv Videos
  • gp Podcasts
  • gc Calendar
  • gd Decoder
  • gz Dataviz
  • ga Datasets
  • gb Blog
  • gk Markets
  • gj Careers
  • gn Prompt Notebook

On this page

  • / Focus search, where there is one
  • t Back to top
  • ? This list
  • Esc Close